Project lead
The County of Maui Department of ʻŌiwi Resources is currently working with Group 70 International, Inc. (G70) to develop the Lahaina Royal Complex Master Plan. The project scope includes hydrology and water policy; wildfire resiliency and risk planning; biological and ecological assessment; cultural landscape architecture; community engagement protocol; transportation circulation planning; topographical survey; cultural and archaeological studies; soils and geotechnical studies; and boundary mapping.
Provide your comments on the draft Action Plan online, by mail or in-person at the Lahaina Resource Center or Kāko‘o Maui Relief & Aid Services Center.

West Maui Greenway
Community Quote from Long-Term Planning Recovery Survey
The West Maui Greenway will provide a variety of community benefits when complete. It will serve as a multimodal transportation corridor providing connections to key community destinations, resilience benefits, such as fuel breaks, and a utility corridor for power, water and wastewater lines. It is also anticipated to provide an amenity to Lahaina that will encourage adjacent economic development.
The West Maui Greenway is a proposed 25-mile multiuse trail that will connect Ukumehame to Līpoa Point. It will provide a safe, multimodal transportation option to using the Honoapiʻilani Highway and act as an alternative evacuation route accessible to vehicles in an emergency, as well as a fire and fuel break for fire protection. Welcoming people of all ages and abilities who walk, bike, or use assisted mobility devices, the West Maui Greenway was identified as a priority project in numerous previous planning efforts. The Maui Metropolitan Planning Organization received federal funding and produced the West Maui Greenway Plan (September 2022) which developed a preferred route alignment, breaking the corridor into seven segments and trail types. This project focuses on Phase 1 which includes Segments 3, 4, and 5 from Lahaina Civic Center to Launiupoko Beach Park (5.25 miles).

West Maui Greenway Proposed Alternatives
Other priority projects included in the LTRP may overlap with the West Maui Greenway including:
$15.43 million